Co-ownership renovation and Climaxion grants: your air tightness tests

Property managers, owners’ councils, project owner assistants and architects: to obtain the Grand Est Region’s grant for the energy renovation of a co-owned building (Climaxion programme), two air tightness tests are required, one before the works to submit the application, the other after the works to obtain the balance. We carry them out and help you pass them.

Request a quote Discuss your building

What the Climaxion scheme requires for co-owned buildings

The regional “Energy renovation of co-owned buildings” scheme funds the renovation of the envelope (walls, ground floor, roof) of an entire building. The application is submitted by the property manager on behalf of the owners’ association, before the call for tenders to contractors.

Pre-works testPost-works test
WhenBefore submitting the application: the report is attached to the requestAt the end of the works: the report is required for payment of the balance
Dwellings tested10 dwellings or fewer: at least the most representative dwelling.
More than 10 dwellings: the 3 most representative dwellings
The same dwellings as before the works, with the same sampling
ContentMeasurement and leak detectionConfirmation measurement
Target result–Q4 below 1.2 m³/(h.m²) if the external windows have been replaced, below 1.7 m³/(h.m²) otherwise

Tests must be carried out by an operator recognised as competent by the ministry in charge of construction. The detailed conditions are set out in the scheme’s rules; your Climaxion contact or France Rénov’ adviser will confirm those that apply to your project.

The pre-works test: much more than a document for the file

Multi-storey building with balconies, air tightness test in a co-owned building

The leak detection carried out before the works shows where air really gets in: windows, roller shutter boxes, service ducts and risers, hatches, junctions with balconies. Passed on to your architect, it allows these points to be included in the works programme and tender documents, instead of discovering them at the final test.

The choice of representative dwellings also matters: the same dwellings will be measured after the works. We prepare it with you, taking into account the dwelling types, floors and access to occupied flats.

Our support

  • Upstream: we define with the property manager, the project owner assistant and the architect the dwellings to be tested, and tell you how to prepare them on test day. Making appointments and access to the dwellings are the responsibility of the property manager or the co-owners.
  • Pre-works test: measurement and leak detection, report ready to attach to the application.
  • During the works: intermediate test on request, to check sensitive points before the finishes are installed.
  • Post-works test on the same dwellings, report for the balance request.

We work throughout Alsace and the Grand Est region, together with property managers, project owner assistants and architects.