Single-family houses, apartment buildings or larger buildings: we carry out several hundred tests every year.

Request a quote

Homeowners in their new house
RE2020 single-family house tested by Exp’Air 67

Single-family houses

We carry out air permeability tests for your new-build or renovation project. Non-exhaustive list.

See our projects
Large building tested by Exp’Air 67

Large buildings

We carry out multi-fan air permeability tests on large buildings: hospitals, sports complexes, concert halls, schools, after-school centres, etc. Non-exhaustive list.

See our projects

Apartment building, air permeability test by regulatory sampling

Apartment buildings

We carry out air permeability tests on residential buildings using regulatory sampling.

See our projects

6 projects up close

Real figures taken from our test reports: the required value, the measured value and what the test brought to the project.

Apartment building tested by Exp’Air 67

Apartment buildings · RE2020

Beelodge Campus residence

Bouygues Immobilier · Mulhouse (68) · 2026

0.99 m³/(h.m²)

measured vs. 1.00 required · 50 flats, 6 tested

RE2020 sample-based completion test on 3,398 m². Compliant with a 1% margin: on apartment buildings, accurate testing and calculation make the difference when the certificate is issued.

Our apartment building tests →

Cité Risler apartment block in Strasbourg before renovation

Renovation · social landlord

Cité Risler, before renovation

Ophéa · Strasbourg-Neudorf · 2024

27 flats

tested in 6 buildings in one week

Airtightness baseline before renovation: 0.52 to 0.80 m³/(h.m²) depending on the building. The landlord now has a reliable starting point to target the works and measure the improvement.

Our apartment building tests →

Timber-frame after-school centre in Betschdorf nearing completion

Public building · timber frame

Betschdorf after-school centre

Municipality of Betschdorf · Bas-Rhin · 2023-2024

0.27 m³/(h.m²)

against a 0.28 target · 1,754 m²

A very demanding target set by the thermal study. Three tests (one zone, then the whole weathertight building, then completion) to fix leaks at the right time. Ventilation ducts checked: class A on supply.

Our large building tests →

Facade of the new Brasserie Perle site

Commercial and production

Brasserie Perle

New production site · 2023-2024

0.60 m³/(h.m²)

vs. 1.7 required · reception and offices

New timber building combining brewing and public areas. Separate intermediate tests on the production hall and the reception area, then completion: a result almost three times better than required.

Our large building tests →

Three-fan blower door set up at INSPE Strasbourg-Meinau

Education · envelope and ducts

INSPE Strasbourg-Meinau

SERS · Strasbourg · 2024

1.18 → 0.79

m³/(h.m²) vs. 1.00 required, from site stage to completion

Multi-fan test at site stage: 1.18, not compliant. The leaks we found were fixed and the completion test gave 0.79. All 6 air handling unit duct networks (nearly 1,500 m² of ductwork) reached class B.

Our ductwork tests →

Ultrasonic leak detection around a window frame

Ultrasonic leak detection

Neuhof secondary school

Solares Bauen · Strasbourg · 2025

5 zones

curtain walls inspected from aerial platform and scaffolding

The construction sequence made a blower door test impossible. Ultrasonic inspection located the defects zone by zone so they could be fixed before the weathertight test.

Ultrasonic leak detection →

Several hundred tests a year since 2009

Exp’Air 67 works with homeowners, builders, developers, landlords and local authorities throughout Alsace and the Grand Est region. Every test complies with NF EN ISO 9972 and is carried out by an operator certified Qualibat 8711 (envelope) and 8721 (ductwork).

Detached houses

New traditional or timber-frame houses, flat-roof houses, low-energy renovations: intermediate tests to fix leaks before finishing, then a final measurement for the RE2020 certificate.

Apartment buildings

Private developments and social housing projects, tested by regulatory sampling, with ventilation ductwork checked during the same visit.

Large and commercial buildings

Schools, childcare centres, healthcare facilities, head offices, hotel complexes and sports centres: multi-fan tests on large volumes, coordinated with the contractors on site.

Why choose us

  • More than 15 years of experience in airtightness testing
  • Two locations in the Bas-Rhin: Flexbourg and Reichstett
  • On site within 48 hours, report within 24 to 48 hours
  • They trust us: Bouygues Immobilier, Eiffage, Promogim, Habitat de l’Ill, Opus 67, CUS Habitat…